Delicacy factory for AAK India Private Limited. Designed, procured & construction-supervised by PMG Engineering.

HIGHLIGHT
All Engineering in One Place (Civil and MEP)
HIGHLIGHT
Multi-stakeholder coordination
OPPORTUNITY → SOLUTION → OUTCOME

Opportunity. AAK intended to expand onto their Amenities infrastructure to better support the operations manpower. While the existing manufacturing infrastructure had reached saturation levels, the company management envisioned a proper, complete and new infrastructure meeting global standards. Further, the expectations of stakeholders of both the local factory and head office were to be understood and aligned before developing a holistic solution.

Solution. PMG team worked with all the stakeholders to identify the needs, requirements and expectations formally. Given the constraints of space, location, and others, viable options of the Architectural Design were developed and discussed. The selected option was further refined till deemed qualified and meeting expected criterias. Subsequently, structural design was done, BOQ and Tender Specifications were developed conforming to local practices of the available contractors. Simultaneously, the MEP works were done to fast track the overall design works.

Outcome. The complete set of Design Deliverables, including Civil Achitectural and Structural Design, Mechanical Electrical and Plumbing Design, and 3D Models were delivered in time, complying relevant standards, and meeting stakeholder expectations. A further discussion was held with potential contractors to onboard them over the design intent and prepared documents for a smooth transition to construction phase.

KEY CHALLENGES
Space constraints
High underground water level
FAQ
What did PMG deliver on this project?
PMG provided Engineering Design for an expansion Edible Oil Factory: Amenity Block Expansion at AAK India Private Limited's facility in Kakinada, Maharashtra, India.
When was this project executed?
PMG executed this project between June 2024 and August 2024, spanning approximately 2 months from kick-off to handover.
What industry does this facility serve?
This is a Food and Beverage facility in the Delicacy segment. PMG's design and execution follow F&B sector hygienic engineering and food-safety practices.