Project Highlights
Conceptualized automation for streamlined and robust oil handling
3 level high interlocking systems for safety and Anti-spillage
SCADA-based inventory management system for whole unloading Process
Enhanced operational efficiency and accuracy
Reduced manual intervention with automated controls
Key Challenges
Design to Integrate SCADA with existing manufacturing systems
Ensuring reliability in high interlocking design
Balancing automation with cost efficiency
Managing the transition to automated processes
Convinced stakeholders to upgrade from manual to automated operations
Capex Basic Design
1.0 lakh
Production ton per day
60.0