HOME / PROJECTS / DRY POWDER INGREDIENTS FACTORY - PROCESS CIP SYSTEM
UPGRADATION 30 TPD DAIRY PRODUCTS 4 MONTHS

Dry Powder Ingredients Factory - Process CIP System

THE BRIEF

30 TPD Dairy Products factory for Drytech Processes. Designed, procured & construction-supervised by PMG Engineering.

HIGHLIGHT
Successful Real-Time Monitoring and Data Backup
HIGHLIGHT
Completion with Minimal Production Downtime
HIGHLIGHT
Flexibility Design for Future Upgradation
HIGHLIGHT
Work Completion Within Two Months
HIGHLIGHT
Qualified Customer’s Audit in the First Go
OPPORTUNITY → SOLUTION → OUTCOME

Opportunity. Drytech Automation in Nagpur faced challenges with their manually operated pasteurization and CIP (Clean-in-Place) systems, which lacked historical data logging and limited their ability to track quality control measures and optimize processes. A key client’s increasing demand for enhanced hygiene and product consistency prompted Drytech to seek an automated solution. The objective was to upgrade to a SCADA-based (Supervisory Control and Data Acquisition) system that would improve operational accuracy, enable historical data backup, and minimize downtime and production losses at their existing facility.

Solution. PMG engineered a solution to automate Drytech’s pasteurization and CIP systems, integrating full SCADA functionality. The upgraded system now allows for precise control of process parameters, ensuring optimal pasteurization temperatures and effective CIP cycles, which enhances product quality and hygiene. Historical data logging and reporting features were implemented, enabling operators to analyze trends, troubleshoot issues efficiently, and maintain high-quality standards. PMG's solution involved retrofitting automation equipment such as sensors, control valves, and programmable logic controllers (PLCs) without disrupting ongoing production. A custom SCADA interface was designed to provide a user-friendly platform for real-time monitoring, control, and data storage, meeting the specific needs of Drytech's premium clients. To minimize production downtime, installation was strategically planned during low production periods, and rigorous Factory Acceptance Tests (FAT) were conducted to ensure system readiness.

Outcome. The automated system now enables Drytech Automation to meet the elevated hygiene and consistency expectations of their premium clients. Operational control has been enhanced with minimal manual intervention, and historical data backup has improved process traceability and troubleshooting. The SCADA system’s flexibility allows for future adjustments to meet evolving requirements. Thanks to PMG’s meticulous planning and execution, downtime was minimized, ensuring a seamless transition with no significant production losses. This upgrade has strengthened Drytech’s ability to deliver high-quality products with improved process reliability and hygiene standards.

KEY CHALLENGES
Unavailability of Plant Shutdowns
Stringent Audit Timelines
Compatibility with Existing Systems
Hygienic Standards in Retrofitted Equipment
Managing Downtime for SCADA Installation and Testing
FAQ
What did PMG deliver on this project?
PMG provided Procurement and Contracting, Construction Supervision, and Engineering Design for an upgradation Dry Powder Ingredients Factory at Drytech Processes's facility in Pandhurna, Madhya Pradesh, India.
When was this project executed?
PMG executed this project between May 2023 and August 2023, spanning approximately 4 months from kick-off to handover.
What is the production capacity of this facility?
The facility is designed for approximately 30 TPD of throughput.
What industry does this facility serve?
This is a Food and Beverage facility in the Dairy Products segment. PMG's design and execution follow F&B sector hygienic engineering and food-safety practices.