An electrical contractor consistently struggled with as-built documentation, typically beginning the process only after construction was substantially complete. Engineers had to retrospectively mark up thousands of drawings, a process that took 2-3 months and was prone to inaccuracies. Clients regularly rejected as-built packages as incomplete, creating project tail costs that eroded profit margins.
PMG As-Built Documentation enabled progressive as-built capture throughout construction, with engineers updating records as installations were completed. The system tracked completeness against the required document list and flagged gaps early. Submission workflows ensured quality review before client delivery, and the package assembly feature compiled all approved as-builts into structured handover sets.
As-built documentation time decreased from 3 months to 2 weeks through progressive capture. First-submission acceptance rate improved from 40% to 88%. Project closeout tail costs reduced by 60%. Engineers reported that progressive documentation was less burdensome than retrospective compilation, improving compliance and accuracy significantly.