Equipment Log
Equipment Log
Go to Workspace
Equipment Log
Challenges
Equipment Log
Features
Case study
Context
Solution
Benefit
A heavy civil contractor managing a fleet of 80+ pieces of equipment across multiple sites tracked deployment in spreadsheets updated weekly. Equipment downtime due to missed maintenance was a recurring problem. When a critical crane broke down during a concrete pour, it was discovered that maintenance had been overdue for three weeks with no system to flag the issue.
PMG Equipment Log maintained a comprehensive equipment register with deployment tracking, utilisation logging, and maintenance scheduling. Automated alerts triggered before maintenance due dates, and equipment status was visible across all sites. The utilisation dashboard showed which equipment was actively deployed, idle, or under maintenance, enabling optimal fleet management.
Equipment downtime due to missed maintenance decreased by 70%. Fleet utilisation improved by 25% through data-driven redeployment decisions. Maintenance compliance reached 95%, up from 60%. The contractor estimated annual savings of 12% on equipment operating costs through better utilisation and preventive maintenance adherence.
Equipment Log
Key Benefits