Project
20000 BPD Cold Pressed Juice Factory
4 TPD المشروبات factory for Namdhari Groups. Designed, procured & construction-supervised by PMG Engineering.
أبرز ملامح المشروع
Successfully relocated equipment for 20000 BPD operations
Optimized layout for enhanced cold-pressed juice production
Minimized downtime during equipment transition
Optimal production capacity post-relocation
Engineer onsite for installation with remote OEM support
التحديات الرئيسية
Ensuring precision alignment during equipment relocation
Adapting infrastructure to new equipment layout
Aligned multiple stakeholders for cohesive project execution
Maintaining equipment integrity during transport
Scheduling downtime to minimize operational impact


