Skip to content
HOME / PROJECTS / CARBONATED DRINKS FACTORY FOR VARUN BEVERAGES VIA TETRAPAK
EXPANSION 900 TPD DRINKS 5 MONTHS

Carbonated Drinks Factory for Varun Beverages via Tetrapak

THE BRIEF

900 TPD Drinks factory for Tetrapak India Pvt Ltd. Designed, procured & construction-supervised by PMG Engineering.

HIGHLIGHT
Brownfield expansion of existing facility
HIGHLIGHT
Delivered as part of Tetrapak-led EPC scope
KEY CHALLENGES
Tie-in with running production with minimal downtime
Brownfield space
utility and access constraints
Phased commissioning around live operations
OEM-aligned execution and battery-limit management
Remote-site logistics
customs and import-equipment scheduling
FAQ
What was PMG's scope on this project?
PMG provided Construction Supervision for this expansion Carbonated Drinks Factory for Varun Beverages, delivered as a sub-contract to Tetrapak at site in Pathankot, Punjab.
When was this project executed?
PMG executed this project between March 2019 and August 2019, spanning approximately 5 months from kick-off to handover.
What is the production capacity of this facility?
The facility is designed for approximately 900 TPD of throughput.
What industry does this facility serve?
This is a Food and Beverage facility in the Drinks segment. PMG's design and execution follow F&B sector hygienic engineering and food-safety practices.