PMG Engineering | Build World-Class Food Factories | Project | 320 KLPD Dairy Factory

Greenfield
Project
320 KLPD Dairy Factory
Sub title
Basic Design (Masterplan in 2D and 3D, Project Scope-Cost-Timeline) for Greenfield Factory
Client
BRAC Dairy & Food Project
Project duration
2023-12-04 to On Going
Project Highlights
Understanding space constrain and utilizing the Vertical height
Optimize warehouse design to PEB for financial benefits
3D design at conceptual stage ensuring stakeholder alignment and understanding
Space optimization and layout efficiency
Design as per the Bangladesh Regulatory compliance
Key Challenges
Space optimization for horizontal expansion within limited footprint
Future-proof design to accommodate scalability and expansion
Incorporating flexibility for future expansion and technology upgrades
Ensuring compliance with local zoning regulations and building codes
Balancing the need for efficient workflow with the optimal utilization of available space.
Production ton per day
320.0
Services Provided